CC Trail Day September 23, 2012 |
Sunday, September 23, 2012
A trail bridge too far
The mission for the THOR brigade for today, build an alternate bridge at Calvin Crest. The sway cable bridge is nice but the bike traffic is putting a bit of stress on it and it would not be suitable in race conditions.
About a hundred yards upstream a new bridge was constructed out of two 17ft telephone polls and treated 2X4s. There was a large crew working the bridge and trail on both sides of the now dry creek. Using a tow strap tied to the heavy poles they were dragged into place.
It was Cody's job to guard the planks.
Once the job was finished there was the matter of a quality assurance load test.
And then the ride...
And finally, DMARS...
Click here for more photos.
Subscribe to:
Post Comments (Atom)
Who is Stratomatic?
- Stratomatic
- Stratomatica - is my blog place where I document things happening around me or that interest me. The name Strata, geologically speaking, are layers of sedimentary rock or soil with internally consistent characteristics that distinguish it from other layers. Too deep? Well, I like guitars. Mostly I like the sound and feel of Stratocasters.
1 comment:
Awesome job and great photos Paul! Thanks to you and THOR for all the hard work!
Post a Comment